In Rochester, the site selected was under Main Street bridge by the Clinton River. CRWC already has been developing this site as part of their WaterTowns initiative, adding a kayak locker and launch in the park. The main issues addressed at this site were runoff from the bridge overpass and how to incorporate placemaking features. To see details and site plan follow the poster and presentation links below.
Rooftop Runoff Collection
Existing:
Proposed: